Network Cabling and Wi-Fi Planner

Draw the network before you pull a single cable.

Mark closets, data drops, access points, fiber, cable tray and power on your own floor plan. Every run is measured, anything over 90 m is flagged, and you get a cable schedule and a closet schedule.

ProjectYour building
SheetN-101 Network layout
ScaleSet from one known distance
Drawn byYou, in about ten minutes
Cost$0

Loading the planner…

Your floor plan stays in your browser. Nothing is uploaded. No sign-up. Best on a computer or tablet.

OFFICE 101BOARDROOMSERVERWAREHOUSE ADD A CLOSET HERE304 FT. OVER THE 90 M LIMIT. TR-01D-01AP-01 120′ – 0″ CLOSETDATA DROPACCESS POINTCABLE RUNOVER 90 M

The plan checks itself as you draw

Cable routes appear as you place each drop, and the totals update beside the plan. A run that is too long turns red straight away, so you fix it on screen and not on site.

Everything that goes on the plan

Eleven symbols and four line types cover a full low-voltage drawing. Each one gets its own ID, and all of them appear in the legend and on the schedule.

Cabled to a closet
Network closetTR-01The telecom room or rack that every drop runs back to. Set the rack type and the UPS, and the planner counts the patch panels, switch ports and PoE load it has to carry.
Data dropD-01A wall plate, floor box or ceiling outlet. Choose the cable type, how many cables, and what it is for: workstation, phone, printer, TV, projector, conference room or POS.
Wi-Fi access pointAP-01A ceiling access point with a coverage circle. Size the circle by the kind of space it serves.
In-room wall APAP-01A wall-plate access point for suites, hotel rooms and small offices where one ceiling unit cannot reach.
Outdoor APAP-01Coverage for a yard, loading dock or parking area, mounted on an exterior wall or pole.
Camera or device dropDV-01A cable for anything that is not a desk: a camera, a time clock, a sensor or a display controller.
Speaker or intercomSP-01An IP paging speaker or intercom station. It runs to a closet like a data drop and counts toward the PoE load.
Marked for coordination, no data cable
Electrical receptacleR-01Where power is needed for the equipment: duplex 15A or 20A, quad, dedicated circuit, floor box, ceiling or GFCI.
Sleeve or penetrationSL-01A 2 in or 4 in sleeve, a core drill or a firestop location where cable passes through a wall or floor.
Demarc or ISP entryDM-01The point where the carrier service enters the building, on fiber, coax, copper or wireless.
Grounding busbarGB-01The telecom grounding busbar in each closet (TGB) and the main one at the service entrance (TMGB).
Drawn as a line
Fiber runF-01The backbone between closets. Pick OS2, OM4 or OM3 and the strand count. Length follows the path you draw.
Cable trayCT-01The tray route above the floor, totalled in feet or metres.
ConduitCN-01A conduit run, for example from the demarc to the main closet or out to a gate.
Wireless bridgeWB-01A point-to-point radio link between two buildings where trenching for fiber is not practical.

What comes out the other end

Cablify Cable schedule
IDTypeRuns toRunStatus
D-03TV / displayTR-0158 ftOK
AP-02Wi-Fi access pointTR-0184 ftOK
SP-01Speaker / intercomTR-0172 ftOK
F-01Fiber run, 12 strandTR-01 to TR-02141 ftOK
CT-01Cable trayAs drawn71 ftOK
D-06Data dropTR-01304 ftOver 90 m
Cablify Closet schedule
ClosetRackCablesPatch panelsPoE budget
TR-014-post rack382 x 24-port260 W
TR-02Wall-mount rack91 x 24-port70 W

Samples of the two schedule pages in the exported PDF. The marked-up plan comes with them.

  1. Every run is measured.Each drop runs to the nearest closet. The planner adds ceiling height and slack, totals the cable by type and counts the boxes.
  2. Long runs turn red.Copper is limited to 90 m (295 ft). Anything over the limit is flagged on the plan and on the schedule, so you see where a second closet belongs.
  3. Each closet gets a parts count.Patch panels, switch ports and PoE load are added up from the cables that land there, next to the rack and UPS you chose.
  4. Pathways are totalled.Fiber, cable tray and conduit are measured along the line you draw. A wireless bridge is listed as a link.
  5. The PDF stays editable.Open the exported file here again and every item comes back, ready to move, add or delete.

How the numbers are worked out

Nothing is hidden. These are the rules behind every figure on the schedule, and you can change the ceiling height, slack and routing in the planner.

Copper cable runroute + ceiling + slackThe route to the closet at right angles, or in a straight line if you choose. Add the ceiling height at the closet, the ceiling height again for a wall or floor outlet, and 10 ft of slack. Ceiling height starts at 10 ft.
Length limit90 m / 295 ftRuns past the limit turn red. Runs from 80 m (262 ft) are marked as close to the limit. Fiber is not held to it. See the distance limits for each cable type.
Cable boxes1,000 ft + 10%Total length for each cable type, plus 10% for waste, divided into 1,000 ft (305 m) boxes.
Patch panels24 ports eachOne port for every cable that lands in the closet.
Switch ports48 ports eachThe same cable count, shown as the number of 48-port switches it fills.
PoE load25 / 15 / 13 W25 W for a ceiling or outdoor access point, 15 W for a speaker, 13 W for a wall AP, camera or device. The budget adds 25% headroom. Use the PoE power calculator for an exact switch check.
Fiber runpath + ceiling x 2 + slackThe path you draw, plus ceiling height at both ends and slack.
Tray and conduitas drawnThe length of the line, with nothing added. Check the fill with the conduit fill calculator.

Where to start with Wi-Fi coverage

Pick the kind of space and the planner sets the circle. These are starting radii for one access point, before walls, racking and stock are taken into account.

Office with walls25 ft / 7.6 mDrywall and glass partitions cut the signal quickly. Plan on one access point for every few rooms.
Meeting room or classroom30 ft / 9 mMany devices in one room. Size it for the number of people, and keep the circles small.
Open office40 ft / 12 mFew obstructions, moderate device count.
Warehouse, tall racking35 ft / 11 mRacking and stock block signal down the aisles. Mount units to look along the aisle.
Warehouse, open floor60 ft / 18 mHigh ceilings and clear sight lines carry further.
Outdoor, open area100 ft / 30 mYards and parking with an outdoor-rated unit.

For a count by building type, read how many access points a building needs. A wireless site survey confirms the final positions.

Open the PDF and keep editing

The exported PDF carries the layout inside it. Open that same file here next week and the closets, drops, access points and runs come back with their IDs, the scale and the project name.

Turn the option off before you export if you want a plain PDF to send out.

Your drawings stay with you

The floor plan is opened, marked up and exported on your own computer. It is not uploaded to Cablify or anyone else, which matters when the drawing shows a server room or a building that is not yours to share.

Files up to 50 MB and 40 pages open in the planner.

Questions people ask

Is the network cabling planner free?

Yes. There is no sign-up, no trial and no limit on the number of plans. Open a floor plan and start placing items.

What kind of floor plan can I open?

A PDF, JPG or PNG. Architectural PDFs work best because the lines stay sharp when you zoom in. A phone photo of a fire-exit plan is enough to get a first cable count.

Is my floor plan uploaded anywhere?

No. The file is opened, marked up and exported inside your browser. It is not sent to Cablify or anyone else.

How accurate are the cable lengths?

They are estimates for budgeting. Each run is the route to the closet, plus the ceiling height at each end that drops down a wall, plus slack. Real routes go around ducts, beams and fire walls, so confirm on site before ordering cable.

Why does a run turn red at 90 m?

Copper Ethernet channels are limited to 100 m, and the permanent cable in the wall and ceiling is limited to 90 m (295 ft). A drop past that limit needs a closer closet or a fiber link, so the planner flags it.

Is the Wi-Fi coverage a heat map?

No. The circles are a planning aid sized by the type of space. They do not model walls, racking or interference. A predictive design or an on-site survey is still needed before access points are ordered for a warehouse or a dense office.

Can I come back and change the layout later?

Yes. Open the PDF you exported and every item comes back editable, with the scale and project name. You can also save a small project file.

Can I mark power outlets on the plan?

Yes. Receptacles are shown so the electrician and the cabling crew work from one drawing. They do not add data cable to the count, and the power work itself is done by a licensed electrical contractor.

Can Cablify install the layout I drew?

Yes. Send us the PDF. We confirm the routes on site and quote the cabling, fiber, Wi-Fi and closets anywhere in Toronto and the GTA.

Want it built? Send us the sheet. Cablify installs structured cabling, fiber and Wi-Fi across Toronto and the GTA, and we quote from the layout you just drew.

Issued for quote1-647-846-1925

The planner is a layout and estimating aid. Lengths, counts and coverage are approximate and do not replace a site visit or a design by a qualified installer.

Service areasTorontoMississaugaBramptonVaughanMarkham & Richmond HillOakvilleMilton & HaltonBoltonAurora & NewmarketBarrieHamilton & BurlingtonGuelphKitchener-WaterlooLondonSt. Catharines & NiagaraMontrealVancouver

© 2026 Cablify. Commercial network cabling and fiber optic installation across Toronto and the GTA.

Call 1-647-846-1925Get a Free Quote