A selection of network cabling, fiber, server room and WiFi survey jobs Cablify has completed for offices, warehouses and data rooms across Toronto, Mississauga, Vaughan and the rest of the GTA. Each write-up covers the building, what the client needed, how we ran and terminated the cable, and how it tested. Client names are left out unless we have permission to use them.

Looking for a similar job? See our office cabling, warehouse cabling, fiber optic cabling and server room cabling pages, or request a free site survey.

Office Wi-Fi Survey and Access Point Redesign, Two-Floor Tech Office in Toronto

Two floors, 100+ staff and Wi-Fi that dropped between the boardroom and the desks. A survey showed the access points were in the wrong places, not that the hardware was wrong.

Read More
warehouse Cabling

Fiber Backbone, 4 IDFs and an MDF for a Large Vaughan Warehouse

One MDF, four IDFs and a fiber backbone across a large Vaughan warehouse, with the conduit to protect it.

Read More

Cat6 and Phone Cabling for a Downtown Toronto Corporate Office

Cat6 FT6 cabling, a 42U cabinet, patch panels, cable tray and access points for a downtown Toronto corporate office, run on site for a head office based in the United States.

Read More
Server room design

Fiber and Cat6 Cabling for a Data Centre near Highway 401 and Mississauga Road

Cabling subcontractor on a high-capacity Mississauga data centre. Floor maps and digital plans signed off before a single cable was pulled, then fiber and Cat6 to the drawing.

Read More
industrial electrical contractors

Structured Cabling for a New Downtown Toronto Office Fit-Out

A growing tech company leased a downtown floor with outdated cabling and a fixed move-in date. Cat6A to the desk, fiber backbone, built around the general contractor schedule.

Read More

Cable Removal and Abatement in a 400,000 sq ft Mississauga Warehouse

Stripping data, phone and CCTV cabling, racks and cabinets out of a 400,000 sq ft Mississauga warehouse before the lease handover, finished ahead of the deadline.